Our 65 000 m² logistics centre ‘Nuremberg West I’ is being built in Burgbernheim, near Nuremberg. With excellent transport links to several major national motorways and a good connection to the Nuremberg freight transport centre, it offers future users optimal conditions for transport and storage - ready for occupancy from Q2 2026!

110,500 m²

Property space

57,166 m²

Warehouse

A7/4 km

Connection

3,133 m²

Office and social space

6,193 m²

Mezzanine space

About the property

The attractive logistics property with approximately 66 492 square meters of warehouse space and almost    6 000 square meters of mezzanine space is being built on a site measuring approximately 110 500 square meters. The approximately 3 100 square meters of office and social space will be complemented by employee friendly indoor and outdoor recreation facilities. In addition to its attractive appearance with a wooden facade and petroleum-colored design, the property also features electric charging stations for cars and trucks, a photovoltaic system, heat pumps, greenery on the facade, and flower meadows. The result is a building that has been designed for the efficient handling of goods and the best possible working conditions in the logistics hall.

 

Location

Steinacher Straße_91593_Burgbernheim_Makrokarte-en
Steinacher Straße_91593_Burgbernheim_Makrokarte-en

Connections

Burgbernheim: approx. 1 km
Albrecht Dürer Airport: approx. 60 km
Motorway A7: approx. 4 km
Motorway A3: approx. 45 km
Port/Freight transport centre (GVZ) Nuremberg: approx. 60 km

Our Design

Objektfotografie Reportagefotografie Swiss Life Lagerhalle Ponitz Februar 2024
Objektfotografie Reportagefotografie Swiss Life Lagerhalle Ponitz Februar 2024
Objektfotografie Reportagefotografie Swiss Life Lagerhalle Ponitz Februar 2024
Objektfotografie Reportagefotografie Swiss Life Lagerhalle Ponitz Februar 2024

Access

The site is located in an industrial area with local and medium-sized companies. In immediate vicinity are the main road B470 and the A7, which intersects with the A3 approx. 45 km further north, thus connecting the location with large supra-regional centres such as Nuremberg/Munich and RheinMain. The region’s good connection to the national transportation network makes it an efficient central supply point. Nuremberg Airport and Nuremberg harbour are both just under 60 km away.

About the Nuremberg logistics region

The Nuremberg logistics region is located in the north-west of the Bavarian logistics region and has an efficient infrastructure that allows it to fulfil its role as a gateway location for international transport. In this regard, the Nuremberg freight transport centre (GVZ) acts as a fundamental infrastructure facility. The freight transport and logistics center is an important hub for transport to and from the North Sea ports, offering daily container train connections to Hamburg, Bremerhaven, Bremen, Verona, and Rotterdam. Conventional bulk materials can also be transported via the adjacent port area. Nuremberg Airport is equipped to handle air freight.

Contact

If you have any further questions or would like to make an appointment, please contact us:

Our Projects

Here we give you an overview of our project pipeline, including brownfield developments, revitalisations and densification as well as project developments.